RAIL PROJECTS
Safety assessment of Communications and Control (SCADA) systems.
E Major was responsible for:
-
Hazard identification and analysis
-
Derived safety requirement Verification and Validation
-
Preparation of Engineering Safety Justifications for Trial Running, Trial Operations and Revenue Service
-
Software defect management
Crossrail C660 Project, Siemens, London

Electrified Railway standard development, Network Rail
Safety assurance in the development of the new Standard for working on Electrified Track [NR/L3/ELP/25000].
E Major was responsible for:
-
Hazard Workshop Facilitation
-
Hazard Log Management

Safety advice and guidance to the Synthetic Environment project in development of off-line digital twins of the railway infrastructure for the Target190 programme.
E Major was responsible for:
-
System and Project Scope Definition
-
System Safety Programme Planning
Target 190 - Synthetic Environment Network Rail

Union Station Enhancement Project, Toronto
Lead Safety and RAM Assessor for the 30% concept design for the redevelopment and capacity expansion of Canada's busiest transport hub, Union Station.
E Major was responsible for:
-
Safety Management Planning and Implementation
-
RAM Planning and Implementation
-
Preliminary Hazard Analysis Report
-
System Hazard Analysis Report
-
Integrated Hazard Log
-
Derived Safety Requirements Report
-
RAM Analysis Report


Implemented the first ever EN 50126 compliant RAM programme in North America.
E Major was responsible for:
-
Stations Safety Case Report
-
Maintenance and Storage Facility Safety Case Report
-
Communications and Control Systems Safety Case Report
-
Energy Systems Safety Case Report
-
Interface Hazard Analysis Report
-
Operations and Support Hazard Analysis Report
Confederation Line, Ottawa
Network Rail, Western Route, Swindon
Delivered first ever Reliability-Centred and Risk-Based Maintenance strategies on UK rail infrastructure Western Route Transformation Programme.
E Major was responsible for:
-
RCM Planning and Workshop Facilitation
-
Temporary Speed Restriction (TSR) Management
-
Chair of the Western Route Reliability Steering Group
-
Determination of CP6 Maintenance Volumes


ETCS, Fjernebane West, Denmark
Provision Safety and RAM Support in the first ever implementation of ETCS Level 2 worldwide.
E Major was responsible for:
-
Infrastructure level RAM analysis
-
Signalling Power RAM Report
-
Control Centre RAM Report
-
Signalling Safety Case Report (60% design)
Network Rail (Crossrail), London
Lead the RAM function for Crossrail On-Network Works to ensure the needs of Operators, Maintainers and Users are realised in the design.
E Major was responsible for:
-
RAM Planning and Management
-
Manage Contractor RAM deliverables
-
Manage development of TRAIL Performance Simulation
-
Chair of DRACAS forum