top of page

RAIL PROJECTS

Safety assessment of Communications  and Control (SCADA) systems.

E Major was responsible for:

  • Hazard identification and analysis

  • Derived safety requirement Verification and Validation

  • Preparation of Engineering Safety Justifications for Trial Running, Trial Operations and Revenue Service

  • Software defect management 

Crossrail C660 Project, Siemens, London
crossrail.jpg
Electrified Railway standard development, Network Rail

Safety assurance in the development of the new Standard for working on Electrified Track [NR/L3/ELP/25000].

E Major was responsible for:

  • Hazard Workshop Facilitation

  • Hazard Log Management

Safety advice and guidance to the Synthetic Environment project in development of off-line digital twins of the railway infrastructure for the Target190 programme.

E Major was responsible for:

  • System and Project Scope Definition

  • System Safety Programme Planning

Target 190 - Synthetic Environment Network Rail
Union Station Enhancement Project, Toronto

Lead Safety and RAM Assessor for the 30% concept design for the redevelopment and capacity expansion of Canada's busiest transport hub, Union Station.

E Major was responsible for:

  • Safety Management Planning and Implementation

  • RAM Planning and Implementation

  • Preliminary Hazard Analysis Report

  • System Hazard Analysis Report

  • Integrated Hazard Log

  • Derived Safety Requirements Report

  • RAM Analysis Report

go trin.jpg
confed line.jpg

Implemented the first ever EN 50126 compliant RAM programme in North America.

E Major was responsible for:

  • Stations Safety Case Report

  • Maintenance and Storage Facility Safety Case Report

  • Communications and Control Systems Safety Case Report

  • Energy Systems Safety Case​ Report

  • Interface Hazard Analysis Report

  • Operations and Support Hazard Analysis Report

Confederation Line, Ottawa
Network Rail, Western Route, Swindon

Delivered first ever Reliability-Centred and Risk-Based Maintenance strategies on UK rail infrastructure Western Route Transformation Programme.

E Major was responsible for:

  • RCM Planning and Workshop Facilitation

  • Temporary Speed Restriction (TSR) Management

  • Chair of the Western Route Reliability Steering Group

  • Determination of CP6 Maintenance Volumes

paddington.jpg
european-train-control-system-etcs-tease
ETCS, Fjernebane West, Denmark

Provision Safety and RAM Support in the first ever implementation of ETCS Level 2 worldwide.

E Major was responsible for:

  • Infrastructure level RAM analysis 

  • Signalling Power RAM Report

  • Control Centre RAM Report

  • Signalling Safety Case Report (60% design) 

Network Rail (Crossrail), London

Lead the RAM function for Crossrail On-Network Works to ensure the needs of Operators, Maintainers and Users are realised in the design.

E Major was responsible for:

  • RAM Planning and Management

  • Manage Contractor RAM deliverables 

  • Manage development of TRAIL Performance Simulation

  • Chair of DRACAS forum

info@emajorengineering.com

Tel: + 44 (0) 7896 501 378

bottom of page